欧美伦三级精品一区二区,最新国产?V无码专区亚洲,巨粗进入警花疼哭,制服丝袜中文字幕在线

http://m.wysclw.cn/en/data/images/slide/20220411164840_402.jpg

Contact

Suzhou Lanxin Rubber Plastic Hardware Co., Ltd.

Contact person: Manager Yin

Phone: 18051899559

Email address: info133@cn-lanxin.com

Contact person: Manager Pan

Phone: 18261672909

Email address: info164@cn-lanxin.com

Machine: 0512-36857023

Website: m.wysclw.cn

Address: No. 904, South Qinfeng Road, Qiandeng Town, Kunshan City, Jiangsu Province


current position: Home >> News >> Company news

The injection molding process of liquid silica gel should be paid attention to

2020-02-14

Notes for liquid silica gel:


1. Combination line: injection speed and pressure need to be adjusted, according to the mold structure adjustment parameters, visibility will be material temperature or mold temperature moderate increase.


2. Sag (shrinkage): insufficient pressure holding appropriately improve pressure holding, insufficient glue amount (under the influence of miscellaneous materials) confirm the shrinkage of the finished product at the feeding mouth is too thick or uneven.


3. Cutting head: check whether there is residual glue on the grabbing pin, the nozzle temperature is too low or the vertical material mouth part is damaged, and the speed of opening mold is too fast to slow down the first section.

 

液態(tài)硅膠


4. Deformation: insufficient pressure holding, insufficient cooling of finished products need to increase the cooling time, bad ejecting and demould confirm whether the ejecting speed is too fast, and confirm whether there are backhook burr on the mold.


5. Injection mark: Injection phenomenon caused by too fast firing speed will be improved if the speed is slowed down. Material drying is not accurate, and part of the mold inlet is too small and shoots slowly and cannot be formed.


6. Flow mark: caused by the outflow of plastic cold material from the screw tube, which can be improved by loosening back, can also reduce the temperature of the nose or adjust the back pressure moderately, but pay attention to the mixing problem of raw material color master.


7. Silver wire: whether the material is indeed dried, whether it is placed too long to reabsorb moisture, whether the added secondary material (pulverized material) is again dried mold leakage or water pipe joint leakage into the mold temperature and environmental temperature difference is mostly.


8. Color difference: check whether the amount of master color is enough, confirm whether the batch number of master color is correct, improve the screw speed to mix the master color evenly, confirm whether the master color feeding meter is abnormal, into the glue point there is color difference or there are obvious rings, you can try to reduce the pressure after injection is not made some adjustments to reduce the stress here.


相關(guān)產(chǎn)品

相關(guān)新聞